joo08v9159647 skapat en ny artikel
1 i - Översätt

financing available | #caminhao de mudanças em sorocaba

financing available

financing available

22, the SC supplies 7.1 A at 9.1 s through the preliminary acceleration part. A sharp deceleration at 83.7 s causes the SC to soak up regenerative power, drawing a peak charging current of −16.8 A.